The Mercedes Benz B 250e was the company’s first full production pure-EV, developed jointly with Tesla – which parent firm Daimler had a small stake in early on. No longer available new, the B 250e nevertheless paved the way for Mercedes Benz’s forthcoming EQ electric brand, along with the EV versions of its Smart brand.
With an official driving range of 124 miles on a single charge, the B 250e was available with the UK Government’s Plug-in Car Grant. Used buyers may still be able to take advantage of the Electric Vehicle Homecharge Scheme grant, which the vehicle also qualifies for.
Official NEDC Range
Mercedes Benz B 250e124 miles
Real-world Range
Mercedes Benz B 250e99 miles
How to charge a Mercedes Benz B 250e

The Mercedes Benz B 250e uses the Type 2 charging standard for AC. The Type 2 inlet is used when charging at home or at public slow and fast AC points. The Mercedes Benz B 250e’s Type 2 inlet is found on the off-side rear 3/4 panel where you would expect to find a petrol flap. There is no rapid charging capability on the Mercedes Benz B 250e.
Mercedes Benz’s B 250e is able to be slow and fast charged from public points, depending on network and type of charge unit. In most cases, slow charging requires a 3-pin-to-Type 2 cable, and fast charging a Type 2-to-Type 2 cable, both of which are usually supplied with the vehicle.
Type 2 – Slow & Fast |
---|
![]() |
Charging requires the EV driver to plug the connectors into the correct inlet, after which the car then ‘talks’ to the charging unit to make sure there is a power supply, that there are no faults, and that it is safe to start charging. If charging at private home or workplace charge point, the vehicle then automatically starts charging.
On a public charger, an activation process is required to initiate charging. Depending on the network provider, this may require the use of an RFID card or smartphone app, often linked to an account which has been set up beforehand. Contactless pay-as-you-go units are also becoming more common on newer units. Once activated, the units will conduct further connection and account checks before starting to charge the vehicle.
How long does it take to charge a Mercedes Benz B 250e?

The following table shows approximate times to charge a Mercedes Benz B 250e. Times are for a 100% charge.
Note that the times shown are only a guide, as very rarely will an EV need to be fully charged from 0%. Other factors that might vary the charging time include ambient temperature, in-vehicle energy loads, any upper and lower charge restrictions to extend battery life and protect against potential damage, and charging rates slowing down as the maximum charge is reached.
Fast 22kW | Fast 7kW | Slow 3kW |
---|---|---|
2:30 mins 0-100% | 4 hours 0-100% | 9:30 hours 0-100% |
The Mercedes Benz B 250e is fitted with an 11 kW on-board charger as standard for AC charging. This means that even when connected to a fast charger with a rated output above 11 kW, the Mercedes Benz B 250e will only be able to charge at the on-board charger’s maximum level.
Use Zap-Map’s Home Charging Calculator to estimate charging times for a Mercedes Benz B 250e. The level of battery charge, connector speed, and on-board charger options can be tailored to your requirements for more accurate results.
How much does it cost to charge a Mercedes Benz B 250e?
The table shown below shows estimates of the cost to charge the Mercedes Benz B 250e’s 28 kWh battery at home, on a domestic tariff. Cost estimates are dependent on the charge remaining, usable battery capacity, and age of battery pack. Cost per mile is calculated using an estimate of real-world range.
Type | Cost/kWh | Cost to charge | Cost per mile | Home | 14 p/kWh | £3.92 | 4.0 p/mile |
---|
Based on these figures, the Mercedes Benz B 250e’s fuel costs are 4-5 p/mile based on real-world energy usage, the cost depending on the type of charging. In general, home charging provides the cheapest per mile cost and public rapid charging tends to be around double the cost. These fuel costs compare favourably with 12-15 p/mile for conventional petrol and diesel cars.
To find the cost and times to charge an EV on a public charge point, Zap-Map’s Public Charging Calculator calculates charging costs for any new or used plug-in vehicle. The results can be personalised for different electricity costs and the level of charge required.
Charging a Mercedes Benz B 250e at home

Charging at home is often the most convenient and cost effective way to recharge an EV. Government grants are available for the installation of home EV charge points, and a large number of companies offer a fully installed charge point for a fixed price.
Most home chargers are either rated at 3 kW or 7 kW. The higher powered wall-mounted units normally cost more than the slower 3 kW option, but halve the time required to fully charge an EV. Many plug-in car manufacturers have deals or partnerships with charge point suppliers, and in some cases provide a free home charge point as part of a new car purchase. Zap-Map recommends shopping about beforehand as there are a number of suitable products on the market.
Charging a Mercedes Benz B 250e on public networks

The UK has a large number of public EV charging networks, with some offering national coverage and others only found in a specific region. The major UK-wide networks include BP Chargemaster (Polar), Ecotricity, Pod Point, and Charge Your Car.
Payment and access methods across networks vary, with some networks providing an RFID card and others a smartphone app to use their services. While most require an account to be set up before use, some rapid units with contactless PAYG card readers are starting to be installed.
Although many EV charge points are free to use, the majority of fast and rapid chargers require payment. Charging tariffs tend to comprise a flat connection fee, a cost per charging time (pence per hour) and/or a cost per energy consumed (pence per kWh). For more information about network tariffs, visit Zap-Map’s public charge point networks guides.